Weisho Electric Co., Ltd.
Previous
Next

YB6-12/0.4-Z Energy Storage Prefabricated Substation

🔋 All-in-One Prefabricated Substation for BESS Integration

The YB6-12/0.4-Z prefabricated substation is specifically designed for battery energy storage systems (BESS), combining high-voltage switchgear, distribution transformer, low-voltage panel, and intelligent monitoring into a weatherproof, modular container. It is engineered for fast deployment in solar+storage, wind+storage, and grid-support projects, meeting the needs of modern distributed energy solutions.


📐 Key Technical Parameters

ParameterSpecification
ModelYB6-12/0.4-Z
Rated Capacity250–2000 kVA (customizable)
High Voltage Level6kV / 10kV / 11kV / 12kV
Low Voltage Level0.4kV / 0.69kV / 1kV
Frequency50Hz or 60Hz
Cooling MethodOil-immersed / Dry-type
HV Switchgear OptionsVacuum breaker, load switch, fuse
Enclosure ProtectionIP54 (outdoor), IP33 (ventilated)
Dimensions3000x2500x2400 mm (standard)
Applicable StandardsIEC 62271-202, GB/T 17467

✅ Features That Make the Difference

  • One-Stop Solution for Energy Storage
    Integrates HV, LV, and transformer sections in a single steel-structured module with separate compartments.

  • Designed for ESS Safety
    Includes battery fault isolation, thermal sensors, and arc flash protection schemes.

  • Flexible System Integration
    Compatible with CATL, BYD, Tesla Powerpack, or containerized lithium-ion systems.

  • Fast Onsite Commissioning
    Arrives fully wired, tested, and ready for connection, cutting deployment time by 70%.

  • Remote Control & Data Access
    Built-in SCADA/EMS interface with Modbus, CAN, and optional 4G/5G modules.


🏗 Application Scenarios

  • PV + Storage Plants (USA, Germany, UAE)

  • Wind Farm Smoothing Substations

  • Commercial & Industrial BESS Hubs

  • Grid Peak-Shaving and Frequency Support Projects

  • EV Charging Parks with Battery Backup


🌍 Real Customer Testimonials

🔹 James M. – Grid Engineer, NextEra Energy (USA)
"We deployed six of these substations across our Texas BESS project—extremely reliable and delivered on time. The plug-and-play concept works well."

🔹 Laura H. – EPC Director, BayWa r.e. (UK)
"It meets G99 grid compliance and integrates seamlessly with Huawei inverters and LG Chem racks."

🔹 Carlos D. – Technical Lead, Iberdrola (Spain)
"Tested in harsh summer and winter conditions. No thermal failures. It’s a compact but durable substation option for hybrid energy facilities."


❓ FAQs – Energy Storage Substation

What’s the advantage of prefabricated over traditional substations?
Prefabricated models cut project delivery time by 40–60% and reduce installation risks.

Can this unit be placed near battery containers?
Yes. Its electromagnetic shielding and temperature protection make it suitable for close coupling with battery enclosures.

Does it support multi-transformer parallel connection?
Yes. You can customize it with busbar couplings or ring main units for redundancy.

Can the transformer type be selected?
Both oil-immersed and cast-resin types are available, based on site conditions.

Is it compliant with European and North American standards?
Yes. Designed per IEC 62271-202 and available with UL/NEMA adaptations upon request.


📞 Contact Us for Drawings, Pricing & SLDs

Thor – Electrical Engineer, Wei Shoe Elec
📞 Phone: +86-0577-62788197
📱 WhatsApp: +86 159 5777 0984
📧 Email: thor@weishoelec.com

Let’s simplify your ESS deployment. Send us your layout, and we’ll return a tailored technical proposal within 24 hours.

Contact Us

Quick Inquiry